HS 250h L4-2.4L (2AZ-FXE) Hybrid (2010)
Battery Condition Monitor: Service and Repair
Removal
HYBRID / BATTERY CONTROL: BATTERY SMART UNIT: REMOVAL
1. REMOVE HYBRID BATTERY JUNCTION BLOCK ASSEMBLY
HINT
See: Power Control System/System Main Relay, Hybrid Drive/Service and Repair/Removal.
2. REMOVE BATTERY SMART UNIT
CAUTION:
Wear insulated gloves.
(a) Disconnect the 3 connectors.
(b) Remove the nut and battery smart unit.