HS 250h L4-2.4L (2AZ-FXE) Hybrid (2010)
(a) Disengage the 4 claws and remove the combination switch assembly.
Installation
HYBRID / BATTERY CONTROL: COMBINATION SWITCH: INSTALLATION
1. INSTALL COMBINATION SWITCH ASSEMBLY
(a) Engage the 4 claws to install the combination switch assembly.
2. INSTALL INSTRUMENT PANEL FINISH PANEL END LH See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Removal and Replacement/Upper Instrument Panel/Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL See: Starting and Charging/Battery/Service and Repair/Installation
4. INSTALL LUGGAGE COMPARTMENT FLOOR MAT See: Starting and Charging/Battery/Service and Repair/Installation
Components
HYBRID / BATTERY CONTROL: HV BATTERY: COMPONENTS