HS 250h L4-2.4L (2AZ-FXE) Hybrid (2010)
(q) Install the wire harness protector and connect the clamp to the floor panel.
2. CONNECT CABLE TO HYBRID BATTERY JUNCTION BLOCK ASSEMBLY
CAUTION:
Wear insulated gloves.
(a) Connect the frame wire with the clamp and 2 nuts.
Text in Illustration
Torque : 9.0 Nm (92 kgf-cm, 80 in-lbf)
NOTICE:
*
Make sure that the ends of the frame wire do not cross over each other.
*
Be sure to connect the frame wire to each correct terminal as shown in the illustration.
(b) Install the battery shield contact.
Text in Illustration
NOTICE:
Be sure to install the battery shield contact in the correct direction.
3. CHECK HIGH VOLTAGE CABLE CONNECTION CONDITION See: Power Control System/System Main Relay, Hybrid Drive/Service and
Repair/Installation
4. CONNECT NO. 4 HYBRID BATTERY SHIELD PANEL
CAUTION:
Wear insulated gloves.
(a) Install the No. 4 hybrid battery shield panel with the 3 bolts and nut.
Text in Illustration