HS 250h L4-2.4L (2AZ-FXE) Hybrid (2010)
Text in Illustration
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
NOTICE:
*
Make sure that the connectors are fully engaged.
*
Be sure to connect the connector to each correct terminal as shown in the illustration.
2. INSTALL INVERTER TERMINAL
CAUTION:
Wear insulated gloves.
(a) Install the bolt, nut and inverter terminal.
Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)
3. INSTALL NO. 5 HYBRID BATTERY INTAKE DUCT See: System Main Relay, Hybrid Drive/Service and Repair/Installation
4. CHECK HIGH VOLTAGE CABLE CONNECTION CONDITION See: System Main Relay, Hybrid Drive/Service and Repair/Installation
5. INSTALL NO. 1 HYBRID BATTERY SHIELD SUB-ASSEMBLY See: System Main Relay, Hybrid Drive/Service and Repair/Installation
6. INSTALL NO. 4 HYBRID BATTERY SHIELD PANEL See: Battery System, Hybrid Drive/Hybrid Battery Bus / Cable/Service and
Repair/Installation
7. INSTALL NO. 3 HYBRID BATTERY EXHAUST DUCT
(a) Install the No. 3 hybrid battery exhaust duct with the 2 clips.
NOTICE:
Ensure that the duct is installed securely.
8. INSTALL NO. 4 HYBRID BATTERY INTAKE DUCT See: Battery System, Hybrid Drive/Battery Cooling Fan/Service and Repair/Installation
9. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER See: Lighting and Horns/Backup Lamp/Service and Repair/Removal and
Replacement/Installation
10. INSTALL NO. 1 LUGGAGE COMPARTMENT LAMP ASSEMBLY
11. INSTALL TOOL WITH STAY BOX SUB-ASSEMBLY
12. INSTALL REAR SEATBACK ASSEMBLY
HINT
See: Body and Frame/Seats/Service and Repair/Removal and Replacement/Rear Seat Assembly/Installation.
13. INSTALL SERVICE PLUG GRIP See: Battery System, Hybrid Drive/Hybrid Battery Service Switch/Service and Repair/Installation
14. INSTALL BATTERY SERVICE HOLE COVER See: Battery System, Hybrid Drive/Hybrid Battery Service Switch/Service and
Repair/Installation
15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL See: Starting and Charging/Battery/Service and Repair/Installation
16. INSTALL LUGGAGE COMPARTMENT FLOOR MAT See: Starting and Charging/Battery/Service and Repair/Installation