HS 250h L4-2.4L (2AZ-FXE) Hybrid (2010)
Dimmer Switch: Service and Repair
Installation
METER / GAUGE / DISPLAY: LIGHT CONTROL RHEOSTAT: INSTALLATION
1. INSTALL LIGHT CONTROL RHEOSTAT
(a) Engage the 2 claws to install the light control rheostat.
2. INSTALL NO. 1 SWITCH HOLE BASE See: Dashboard / Instrument Panel/Service and Repair/Removal and Replacement/Upper Instrument
Panel/Installation
3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL See: Dashboard / Instrument Panel/Service and Repair/Removal and
Replacement/Upper Instrument Panel/Installation
4. INSTALL INSTRUMENT SIDE PANEL LH See: Dashboard / Instrument Panel/Service and Repair/Removal and Replacement/Upper
Instrument Panel/Installation
5. INSTALL COWL SIDE TRIM BOARD LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Removal and
Replacement/Installation
6. INSTALL FRONT DOOR OPENING TRIM COVER LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and
Repair/Removal and Replacement/Installation
7. INSTALL FRONT DOOR SCUFF PLATE LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Removal and
Replacement/Installation