HS 250h L4-2.4L (2AZ-FXE) Hybrid (2010)
Main Relay (Computer/Fuel System): Testing and Inspection
Inspection
2AZ-FXE ENGINE CONTROL: INTEGRATION RELAY: INSPECTION
1. INSPECT NO. 1 INTEGRATION RELAY
Text in Illustration
(a) IG2 RELAY:
(1) Measure the resistance according to the value(s) in the table below.
Text in Illustration
Standard Resistance:
(1) If the resistance is not as specified, replace the integration relay.
(b) EFI MAIN RELAY:
(1) Measure the resistance according to the value(s) in the table below.
Text in Illustration