IS 250 AWD V6-2.5L (4GR-FSE) (2006)
5. INSTALL TERMINAL INSULATOR
a. Install the terminal insulator to the generator coil.
6. INSTALL GENERATOR REAR END COVER
a. Install the generator rear end cover to the generator coil with the 3 nuts.
Torque: 4.6 N.m (47 kgf.cm, 41 in.lbf)
7. INSTALL CLUTCH PULLEY
a. Temporarily install the clutch pulley onto the rotor shaft.
b. Set SST (A) and (B).
SST 09820-63020