IS 250 RWD V6-2.5L (4GR-FSE) (2007)
b. Install the cold start injector with the 2 bolts.
Torque: 10 N.m(102 kgf.cm, 7 ft.lbf)
c. Install 2 new gaskets and the hose to the cold start injector with the bolt.
Torque: 15 N.m(153 kgf.cm, 11 ft.lbf)
NOTE
-
Be careful not to damage the gasket.
-
Do not fold or bend the hose.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
3. CHECK FOR FUEL LEAKAGE
4. INSTALL V-BANK COVER SUB-ASSEMBLY
5. PERFORM INITIALIZATION
a. Perform initialization
HINT: Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.