IS 250C V6-2.5L (4GR-FSE) (2011)
(b) Slide the rubber boot back as shown in the illustration.
Text in Illustration
(c) Connect the No. 2 parking brake cable assembly and No. 3 parking brake cable assembly to the parking brake equalizer.
(d) Install the No. 2 parking brake cable assembly and No. 3 parking brake cable assembly with the 2 bolts.
Torque : 6.0 Nm (61 kgf-cm, 53 in-lbf)
3. INSTALL PARKING BRAKE RETURN WITH DAMPER SPRING
(a) Using needle-nose pliers, install the parking brake return with damper spring.
4. INSTALL FRONT UPPER FLOOR REAR SUB PANEL SUB-ASSEMBLY
(a) Install the front upper floor rear sub panel sub-assembly with the 4 bolts.
Torque : 18 Nm (178 kgf-cm, 13 ft-lbf)
(b) Engage the 6 clamps.
5. INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
(a) Refer to the instructions for Installation of the propeller shaft with center bearing assembly See: Transmission and Drivetrain/Drive/Propeller
Shafts, Bearings and Joints/Drive/Propeller Shaft/Service and Repair/Removal and Replacement/Installation.
6. INSTALL CENTER AIRBAG SENSOR ASSEMBLY
HINT