IS 250C V6-2.5L (4GR-FSE) (2011)
Dimmer Switch: Service and Repair
Installation
METER / GAUGE / DISPLAY: LIGHT CONTROL RHEOSTAT: INSTALLATION
1. INSTALL LIGHT CONTROL RHEOSTAT
(a) Engage the 2 claws to install the light control rheostat.
(b) Install the finish panel No. 2 retainer with switch with the 3 screws.
2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Removal and Replacement/Installation
3. INSTALL INSTRUMENT SIDE PANEL LH See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and
Repair/Removal and Replacement/Installation
4. INSTALL FRONT DOOR OPENING TRIM COVER LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and
Repair/Removal and Replacement/Roof Headlining (for Front Side)/Installation
5. INSTALL DOOR SCUFF PLATE ASSEMBLY LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Removal and
Replacement/Roof Headlining (for Front Side)/Installation