IS 250C V6-2.5L (4GR-FSE) (2011)
Positive Crankcase Ventilation Valve: Service and Repair
Installation
4GR-FSE EMISSION CONTROL: PCV VALVE: INSTALLATION
1. INSTALL VENTILATION VALVE SUB-ASSEMBLY
(a) Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.
Text in Illustration
Adhesive:
Toyota genuine adhesive 1324, three bond 1324 or equivalent
(b) Install the ventilation valve sub-assembly.
Torque : 27 Nm (275 kgf-cm, 20 ft-lbf)
(c) Connect the ventilation hose.
2. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Installation