IS 250C V6-2.5L (4GR-FSE) (2011)
Secondary Injector Control Module: Service and Repair
Installation
4GR-FSE FUEL: INJECTOR DRIVER: INSTALLATION
1. INSTALL INJECTOR DRIVER
(a) Install the injector driver with the bolt and 2 nuts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
NOTICE:
*
Be careful not to drop or strike the injector driver.
*
The injector driver is grounded at the bolt and nut. To ensure that it is grounded, clean all oil and foreign matter from the
installation areas of the injector driver and engine before installing the injector driver.
(b) Connect the 4 connectors to the injector driver.
2. INSTALL NO. 1 ENGINE COVER See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Unit/Installation
3. INSTALL NO. 1 INLET AIR CLEANER See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation
4. INSTALL COOL AIR INTAKE DUCT SEAL See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation