IS 250C V6-2.5L (4GR-FSE) (2011)
Repair/Removal and Replacement/Roof Headlining (for Front Side)/Removal
5. REMOVE INSTRUMENT SIDE PANEL LH See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and
Repair/Removal and Replacement/Removal
6. REMOVE NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Removal and Replacement/Removal
7. REMOVE LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Removal and Replacement/Removal
8. REMOVE DRIVER SIDE KNEE AIRBAG ASSEMBLY
CAUTION:
When storing the driver side knee airbag assembly, keep the airbag deployment side facing upward.
(a) Check that the engine switch is off.
(b) Check that the cable is disconnected from the negative (-) battery terminal.
CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.
(c) Disengage the claw and separate the hood lock control cable.
(d) Remove the 4 bolts.
(e) Disengage the 2 pins to separate the driver side knee airbag assembly.