IS 250C V6-2.5L (4GR-FSE) (2011)
Power Distribution Module: Service and Repair
Installation
POWER DISTRIBUTION: POWER SOURCE CONTROL ECU: INSTALLATION
1. INSTALL POWER SOURCE CONTROL ECU
(a) Connect the connector.
(b) Install the power source control ECU with the bolt and 2 nuts.
Bolt - Torque : 11 Nm (107 kgf-cm, 8 ft-lbf)
Nut - Torque : 13 Nm (126 kgf-cm, 9 ft-lbf)
2. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Removal and Replacement/Installation
3. INSTALL FRONT PASSENGER SIDE KNEE AIRBAG ASSEMBLY See: Restraint Systems/Air Bag Systems/Air Bag/Service and
Repair/Removal and Replacement/Knee Airbag Assembly (for Front Passenger Side)/Installation
4. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Removal and Replacement/Installation
5. INSTALL INSTRUMENT SIDE PANEL RH See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument Panel/Service and
Repair/Removal and Replacement/Installation
6. INSTALL FRONT DOOR OPENING TRIM COVER RH
HINT
Use the same procedure for the RH side and LH side See: Body and Frame/Interior Moulding / Trim/Headliner/Service and
Repair/Removal and Replacement/Roof Headlining (for Front Side)/Installation.
7. INSTALL DOOR SCUFF PLATE ASSEMBLY RH
HINT
Use the same procedure for the RH side and LH side See: Body and Frame/Interior Moulding / Trim/Headliner/Service and
Repair/Removal and Replacement/Roof Headlining (for Front Side)/Installation.
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and Inspection/Repair
Instruction - Initialization.