IS 300 L6-3.0L (2JZ-GE) (2001)
b. Align the holes of the push rod and housing, pass a 1.5 mm hexagon wrench through the holes to keep the push rod retracted.
c. Release the press.
d. Install the dust boot onto the tensioner.
16. INSTALL TIMING BELT TENSIONER
a. Temporarily install the tensioner with the 2 bolts.
b. Alternately tighten the 2 bolts.
Torque: 27 Nm (270 kgf-cm, 20 ft. lbs.)
c. Remove the 1.5 mm hexagon wrench from the tensioner with pliers.
17. CHECK VALVE TIMING
a. Slowly turn the crankshaft pulley 2 revolutions from TDC to TDC.
NOTICE: Always turn the crankshaft clockwise.