IS 300 L6-3.0L (2JZ-GE) (2001)
assembly with a new one.
-
When installing the sensor assembly, take care that the SRS wiring does not interfere with other parts and is not pinched between other
parts.
-
After installing, shake the sensor assembly to check that there is no looseness.
2. INSTALL CONTROL POSITION INDICATOR PLATE
a. Connect the engagement of the claw at 4 positions and install the control position indicator plate.
b. Connect the connector.
3. INSTALL CONSOLE BOX
4. INSTALL PARKING BRAKE HOLE COVER
5. INSTALL A/C CONTROL WITH RADIO RECEIVER ASSEMBLY
6. INSTALL LOWER CENTER CLUSTER FINISH PANEL
7. INSTALL CENTER CLUSTER FINISH PANEL
8. INSTALL CENTER REGISTER OPENING COVER
9. INSTALL UPPER CONSOLE PANEL
10. INSTALL FLOOR SHIFT LEVER KNOB