lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Evaporative Emission Control Canister|Diagrams|Page 4867 > < Evaporative Emission Control Canister|Diagrams|Page 4865
Page 2
background image

1. INSTALL CHARCOAL CANISTER ASSEMBLY

a. Install the charcoal canister assembly, 2 spacer and 4 nuts.

Torque: 5.5 N.m (56 kgf.cm, 49 in.lbf) 

b. Connect the 2 quick connectors, hose and connector.

c. Connect the wire harness with the 2 clamps.

2. INSTALL FLOOR UNDER COVER

a. Install the floor under cover with the 4 clips and 5 nuts.

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4. PERFORM INITIALIZATION

a. Perform initialization, See: Computers and Control Systems/Testing and Inspection/Programming and Relearning.

Evaporative Emission Control Canister|Diagrams|Page 4867 > < Evaporative Emission Control Canister|Diagrams|Page 4865