lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Relays and Modules - Cooling System > < Radiator|Testing and Inspection|Page 3411
Page 9
background image

9. INSTALL RADIATOR RESERVOIR ASSEMBLY

10. INSTALL ECM OUTLET DUCT

11. CONNECT OIL COOLER OUTLET HOSE

HINT:
^

The direction of the hose clamp is indicated in the illustration.

^

Insert the outlet hose into the stopper. Set the hose clamp so that the clearance between the hose clamp and the stopper is within 2 to 7 mm
(0.08 to 0.28 in.)
.

12. CONNECT OIL COOLER INLET HOSE
13. CONNECT NO. 2 RADIATOR HOSE
14. CONNECT NO. 1 RADIATOR HOSE
15. INSTALL COOL AIR INTAKE DUCT SEAL

(a)

Install the duct seal with the 4 clips.

16. INSTALL NO. 1 AIR CLEANER INLET
17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
18. INSTALL COWL TOP VENTILATOR LOUVER RH
19. ADD ENGINE COOLANT
20. INSPECT FOR COOLANT LEAK
21. ADJUST MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/ Dynamic Radar Cruise Control System)
22. INSTALL RADIATOR GRILLE ASSEMBLY
23. INSTALL ENGINE ROOM SIDE COVER RH
24. INSTALL ENGINE ROOM SIDE COVER LH
25. INSTALL AIR CLEANER INLET COVER
26. INSTALL V-BANK COVER SUB-ASSEMBLY
27. INSTALL NO. 1 ENGINE UNDER COVER
28. PERFORM INITIALIZATION

(a)

Perform initialization.

NOTICE:  Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

Relays and Modules - Cooling System > < Radiator|Testing and Inspection|Page 3411