LS 460 AWD V8-4.6L (1UR-FSE) (2009)
(b) Connect the 5 connectors and attach the 2 clips and 3 clamps.
HINT: Connect connector A as shown in the illustration.
2. INSTALL POWER STEERING LINK ASSEMBLY (for 2WD)
(a) Install the power steering link and rack housing bracket to the front frame with the 4 bolts and 4 nuts.
Torque: 70 Nm (714 kgf-cm, 52 ft-lbf)
(b) Connect the 5 connectors and attach the 3 clips.
HINT: Connect connector A as shown in the illustration.