lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Camshaft Oil Control Valve|Page 2516 > < Camshaft Oil Control Valve|Page 2514
Page 1
background image

Variable Valve Timing Actuator: Testing and Inspection
VVT Relay

1UR-FSE ENGINE CONTROL SYSTEM: VVT RELAY: ON-VEHICLE INSPECTION

1. REMOVE COWL TOP VENTILATOR LOUVER RH   See: Starting and Charging/Charging System/Alternator/Service and Repair/Removal and

Replacement/Removal

2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

CAUTION:
Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt
pretensioner activation.

NOTICE:
After the engine switch is turned off, the HDD navigation system requires approximately 6 minutes to record various types of memory
and settings. As a result, after turning the engine switch off, wait 6 minutes or more before disconnecting the cable from the negative
(-) battery terminal.

3. REMOVE VVT RELAY (VVT RH, VVT LH)

(a) Remove the VVT relay from the engine room No. 2 relay block.

4. INSPECT VVT RELAY

(a) Measure the resistance according to the value(s) in the table below.

Standard resistance:

(b) If the result is not as specified, replace the relay.

5. INSTALL VVT RELAY

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

7. INSTALL COWL TOP VENTILATOR LOUVER RH   See: Starting and Charging/Charging System/Alternator/Service and Repair/Removal and

Replacement/Installation

8. PERFORM INITIALIZATION

(a) Perform initialization    See: Testing and Inspection/Programming and Relearning.

NOTICE:
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

Camshaft Oil Control Valve|Page 2516 > < Camshaft Oil Control Valve|Page 2514