LS 600h V8-5.0L (2UR-FSE) Hybrid (2008)
17. CONNECT NO. 3 RELAY BLOCK
(a) Install the No. 3 relay block to the reservoir bracket.
NOTE: Make sure that the claw of the No. 3 relay block is securely attached to the reservoir bracket.
18. INSTALL SKID CONTROL ECU See: Antilock Brakes / Traction Control Systems/Electronic Brake Control Module/Service and
Repair/Installation
19. CONNECT NO. 1 MOTOR COOLING PIPE See: Antilock Brakes / Traction Control Systems/Electronic Brake Control Module/Service and
Repair/Installation
20. INSTALL SERVICE PLUG GRIP See: Hybrid Drive Systems/Battery System, Hybrid Drive/Hybrid Battery Service Switch/Service and
Repair/Installation
21. REMOVE BATTERY SERVICE HOLE COVER See: Hybrid Drive Systems/Battery System, Hybrid Drive/Hybrid Battery Service Switch
22. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.
23. INSTALL BATTERY SERVICE HOLE COVER LH See: Starting and Charging/Battery
24. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY
25. BLEEDING PRECAUTION
CAUTION: Be sure to read the "PRECAUTION" thoroughly before bleeding See: Service Precautions.
26. CONNECT BRAKE ACCUMULATOR PUMP CONNECTORS
(a) Connect the 2 brake accumulator pump connectors.
-
Before connecting the vehicle wire harnesses, make sure that the connector faces are free of foreign matter.
-
Make sure that the connectors are locked securely.
27. PERFORM ACCUMULATOR ZERO DOWN See: Brake Fluid/Service and Repair