LS 600h V8-5.0L (2UR-FSE) Hybrid (2008)
Torque: 16 Nm (163 kgf-cm, 12 ft-lbf)
NOTE: Thoroughly wipe clean any seal packing.
3. SET NO. 1 CYLINDER TO TDC / COMPRESSION See: Service and Repair/Overhaul/Reassembly
4. INSTALL NO. 3 CHAIN TENSIONER ASSEMBLY See: Service and Repair/Overhaul/Reassembly
5. INSTALL NO. 1 CHAIN SUB-ASSEMBLY LH See: Service and Repair/Overhaul/Reassembly
6. INSTALL NO. 1 CHAIN TENSIONER SLIPPER LH See: Service and Repair/Overhaul/Reassembly
7. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY LH See: Service and Repair/Overhaul/Reassembly
8. INSTALL NO. 1 CHAIN VIBRATION DAMPER LH See: Service and Repair/Overhaul/Reassembly
9. TIGHTEN CAMSHAFT TIMING GEAR ASSEMBLY See: Service and Repair/Overhaul/Reassembly
10. CHECK NO. 1 CYLINDER TO TDC / COMPRESSION See: Service and Repair/Overhaul/Reassembly
11. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
(a) Install the timing chain cover See: Engine Lubrication/Oil Pump/Service and Repair/Installation.
12. INSTALL SERVICE PLUG GRIP See: Hybrid Drive Systems/Battery System, Hybrid Drive/Hybrid Battery Service Switch/Service and
Repair/Installation
13. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected See: Testing and
Inspection/Programming and Relearning/Repair Instruction - Initialization.