LS 600h V8-5.0L (2UR-FSE) Hybrid (2008)
(a) Connect the wire harness with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
8. CONNECT WATER HOSE SUB-ASSEMBLY
(a) Connect the water hose with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
9. CONNECT NO. 2 RADIATOR HOSE See: Cooling System/Thermostat/Service and Repair/Installation
10. INSTALL V-RIBBED BELT See: Drive Belts, Mounts, Brackets and Accessories/Drive Belt/Service and Repair/Installation
11. INSTALL INTAKE AIR CONNECTOR PIPE See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and
Repair/Installation
12. INSTALL RADIATOR RESERVOIR ASSEMBLY See: Cooling System/Thermostat/Service and Repair/Installation
13. ADD ENGINE COOLANT See: Cooling System/Coolant/Service and Repair
14. INSPECT FOR COOLANT LEAK See: Cooling System/Testing and Inspection/Cooling System
15. INSTALL NO. 1 ENGINE UNDER COVER See: Service and Repair/Removal and Replacement/Engine Assembly/Installation
16. INSTALL NO. 1 AIR CLEANER INLET See: Service and Repair/Removal and Replacement/Engine Assembly/Installation
17. INSTALL ENGINE ROOM SIDE COVER RH See: Service and Repair/Removal and Replacement/Engine Assembly/Installation
18. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY See: Service and Repair/Removal and Replacement/Engine Assembly/Installation
19. INSTALL V-BANK COVER SUB-ASSEMBLY See: Service and Repair/Removal and Replacement/Engine Assembly/Installation