LS 600h V8-5.0L (2UR-FSE) Hybrid (2008)
(a) Install the condenser to the HV battery with the bolt.
Torque: 7.5 Nm (77 kgf-cm, 66 in-lbf)
2. INSTALL NO. 2 HV BATTERY PACK WIRE
CAUTION: Wear insulated gloves.
(a) Connect the 3 connectors, 2 clamps and install the No. 2 HV battery wire to the HV battery.
NOTE: If the wire harness clamp is damaged, replace it with a new one.
3. INSTALL BATTERY SMART UNIT See: Battery Smart Unit/Installation
4. INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY See: Power Control System/System Main Relay, Hybrid Drive/Service and
Repair/Installation
5. INSTALL HV BATTERY TERMINAL BLOCK See: Power Control System/System Main Relay, Hybrid Drive/Service and Repair/Installation
6. INSTALL HYBRID VEHICLE CONVERTER See: Power Control System/Voltage Converter/Service and Repair/Hybrid Vehicle
Converter/Installation
7. INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY
CAUTION: Wear insulated gloves.
(a) Install the upper HV battery cover sub-assembly to the HV battery with the 5 nuts and bolt.
Torque: 7.5 Nm (77 kgf-cm, 66 in-lbf)
8. INSTALL CONDENSER
CAUTION: Wear insulated gloves.