LS 600h V8-5.0L (2UR-FSE) Hybrid (2008)
(l) Connect the frame wire to the HV battery with the connector and 4 clamps.
(m)Engage the claw and connect the frame wire to the junction block.
(n) Secure the frame wire to the luggage room junction block with the 2 nuts.
Torque: 13 Nm (130 kgf-cm, 10 ft-lbf)
(o) Install the wire harness protector with the 2 nuts and clamp.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
16. INSTALL SPARE WHEEL GUARD SUB-ASSEMBLY
(a) Install the spare wheel guard sub-assembly with the 2 clips.
17. INSTALL BATTERY COOLING BLOWER ASSEMBLY See: Battery Cooling Fan/Service and Repair/Installation
18. INSTALL NO. 2 HV BATTERY INTAKE DUCT See: Battery Cooling Fan/Service and Repair/Installation
19. INSTALL NO. 3 HV BATTERY INTAKE DUCT See: Battery Cooling Fan/Service and Repair/Installation
20. INSTALL LUGGAGE COMPARTMENT TRIM COVER ASSEMBLY RH
21. INSTALL LUGGAGE COMPARTMENT TRIM COVER ASSEMBLY LH
22. INSTALL REAR FLOOR FINISH PLATE
23. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER