LS 600h V8-5.0L (2UR-FSE) Hybrid (2008)
(a) Install the battery smart unit and the ground cable with the nut.
Torque: 7.5 Nm (77 kgf-cm, 66 in-lbf)
-
Make sure that the ground cable stopper is securely inserted in the hole.
-
Make sure that the ground cable is installed on top of the bracket for the battery smart unit.
(b) Connect the 3 connectors to the battery smart unit.
2. INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY See: Power Control System/System Main Relay, Hybrid Drive/Service and
Repair/Installation
3. INSTALL HV BATTERY TERMINAL BLOCK See: Power Control System/System Main Relay, Hybrid Drive/Service and Repair/Installation
4. INSTALL HYBRID VEHICLE CONVERTER See: Power Control System/Voltage Converter/Service and Repair/Hybrid Vehicle
Converter/Installation
5. INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY See: HV Battery/Installation
6. INSTALL CONDENSER See: HV Battery/Installation
7. INSTALL NO. 1 HV BATTERY COVER INTAKE DUCT See: HV Battery/Installation
8. INSTALL POWER STEERING CONVERTER WIRE See: HV Battery/Installation
9. INSTALL NO. 1 HV BATTERY SHIELD SUB-ASSEMBLY See: HV Battery/Installation
10. INSTALL HV BATTERY
See: HV Battery/Installation