lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 5018 > < Initial Inspection and Diagnostic Overview|Page 5016
Page 73
background image

(a) Measure the resistance according to the value(s) in the table below.

Standard resistance:

NG -- CONNECT CONNECTOR
OK -- REPLACE NO. 2 JUNCTION CONNECTOR

5. CONNECT CONNECTOR

(a) Reconnect the L97 No. 2 junction connector connector.

NEXT -- Continue to next step.

6. CHECK FOR OPEN IN CAN BUS MAIN WIRE (NO. 1 JUNCTION CONNECTOR - ECM)

(a) Disconnect the A67 No. 1 junction connector connector.
(b) Measure the resistance according to the value(s) in the table below.

Standard resistance:

NG -- CONNECT CONNECTOR
OK -- Continue to next step.

7. CHECK FOR OPEN IN CAN BUS MAIN WIRE (NO. 1 JUNCTION CONNECTOR - NO. 2 JUNCTION CONNECTOR)

Initial Inspection and Diagnostic Overview|Page 5018 > < Initial Inspection and Diagnostic Overview|Page 5016