LS 600h V8-5.0L (2UR-FSE) Hybrid (2008)
REMOVAL
HINT: When viewed from the rear of the engine assembly, Bank 1 is on the left side and Bank 2 is on the right side.
1. REMOVE V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Removal
2. REMOVE AIR CLEANER INLET COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Engine Assembly/Removal
3. REMOVE NO. 1 AIR CLEANER INLET See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Removal
4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)
(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.
5. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 2)
(a) Disconnect the oil control valve connector.
(b) Remove the bolt and oil control valve.
(c) Remove the O-ring from the oil control valve.
Installation
2UR-FSE ENGINE CONTROL SYSTEM: CAMSHAFT OIL CONTROL VALVE: INSTALLATION
INSTALLATION
HINT: When viewed from the rear of the engine assembly, Bank 1 is on the left side and Bank 2 is on the right side.
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY (for Bank 1)
(a) Apply a light coat of engine oil to a new O-ring, and install it to the oil control valve.