LS 600h V8-5.0L (2UR-FSE) Hybrid (2008)
Catalytic Converter Bypass Valve Vacuum Switch: Service and Repair
Installation
2UR-FSE EMISSION CONTROL: HYDROCARBON ADSORBER CATALYST SWITCHING VALVE: INSTALLATION
INSTALLATION
1. INSTALL HYDROCARBON ADSORBER CATALYST SWITCHING VALVE
(a) Install the hydrocarbon adsorber catalyst switching valve with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 2 air hoses to the hydrocarbon adsorber catalyst switching valve.
(c) Connect the hydrocarbon adsorber catalyst switching valve connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Engine
Assembly/Installation