lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Variable Valve Timing Actuator Position Sensor > < Diagram Information and Instructions|Page 1448
Page 2
background image

4. INSTALL AND ADJUST PARK/NEUTRAL POSITION SWITCH

a. Install the park/neutral position switch with the 2 bolts. 

Torque: 5.4 Nm (55 kgf cm, 48 inch lbs.)

b. Install a new lock plate and nut.

Torque: 6.9 Nm (70 kgf cm, 61 inch lbs.)

c. Bend the claws on the lock plate to fix the nut.

d. Install the control shaft lever with the nut.

Torque: 13 Nm (130 kgf cm, 9 ft. lbs.)

e. Connect the shift control cable to the control shaft.

Torque: 15 Nm (150 kgf cm, 11 ft. lbs.)

5. CONNECT PARK/NEUTRAL POSITION SWITCH CONNECTOR 
6. CHECK PARK/NEUTRAL POSITION OPERATION 

Check that the engine can be started with the shift lever only in the N or P position, but not in other position. If the engine cannot be started not as
stated above, carry out the adjustment procedure. 

7. INSTALL ENGINE UNDER COVER
8. TEST DRIVE VEHICLE

Variable Valve Timing Actuator Position Sensor > < Diagram Information and Instructions|Page 1448