RX 350 FWD V6-3.5L (2GR-FE) (2010)
(b) Disconnect the connector.
(c) Remove the 3 screws and front blower motor sub-assembly.
Up to 08/2009
HEATING / AIR CONDITIONING: FRONT BLOWER MOTOR: INSTALLATION
1. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY
(a) Install the front blower motor sub-assembly with the 3 screws.
(b) Connect the connector.
(c) Engage the clamp.
2. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Removal and Replacement/Installation
From 08/2009
HEATING / AIR CONDITIONING: FRONT BLOWER MOTOR: INSTALLATION
1. INSTALL FRONT BLOWER MOTOR SUB-ASSEMBLY
(a) Install the front blower motor sub-assembly with the 3 screws.
(b) Connect the connector.
(c) Engage the clamp.
2. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Removal and Replacement/Installation