lexus Workshop Repair Guides

Lexus Workshop Service and Repair Manuals

Component Tests and General Diagnostics|Page 348 > < Engine Controls - Techstream(R) ECU Re-Flash Procedure|Page 345
Page 1
background image

Engine Control Module: Component Tests and General Diagnostics

2GR-FXE ENGINE CONTROL: SFI SYSTEM: ECM Power Source Circuit
 - ECM Power Source Circuit

DESCRIPTION

When the power switch is turned on (IG), the battery voltage is applied to IGSW of the ECM. The output signal from the MREL terminal of the ECM
causes a current to flow to the coil, closing the contact of the EFI MAIN relay and supplying power to terminals +B and +B2 of the ECM.

WIRING DIAGRAM

INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.

PROCEDURE

1. CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)

(a) Disconnect the ECM connector.

(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

(c) Reconnect the ECM connector.

NG --  REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - BODY GROUND)
OK -- Continue to next step.

2. INSPECT ECM (IGSW VOLTAGE)

(a) Disconnect the ECM connector.

Component Tests and General Diagnostics|Page 348 > < Engine Controls - Techstream(R) ECU Re-Flash Procedure|Page 345