SC 400 V8-4.0L (1UZ-FE) (1997)
Shift Interlock Solenoid: Testing and Inspection
1. Inspect shift lock solenoid, as follows:
a. Disconnect the solenoid connector.
b. Using an ohmmeter, measure the resistance between terminals.
Standard resistance: 20-28 ohms
If resistance value is not as specified, replace the solenoid.
c. Apply the battery positive voltage between terminals. At this time, confirm that the solenoid operates. If solenoid operation is not as specified,
replace solenoid.