mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Shift Solenoid, A/T > < Solenoid Valve Removal/Installation (Primary Control Valve Body)
Page 1
background image

Pressure Regulating Solenoid: Service and Repair
Solenoid Valve Removal/Installation (Secondary Control Valve Body)

SOLENOID VALVE REMOVAL/INSTALLATION (SECONDARY CONTROL VALVE BODY) [FS5A-EL] 

1. Disconnect the negative battery cable.
2. Remove the battery and battery tray.
3. Remove the under cover.
4. Drain the ATF
5. Remove the oil cover.
6. Remove the secondary control valve body.

7. Remove the bracket.

8. Remove the solenoid valve(s).
9. Apply ATF to a new O-ring and install it on the solenoid valve.

10. Install the solenoid valve in the secondary control valve body.

Tightening torque 7.8 - 10.8 N-m (80 - 110 kgf-cm, 70 - 95.4 in-lbf) 

11. Install the secondary control valve body.
12. Install the oil cover.
13. Install the under cover.
14. Connect the negative battery cable.
15. Add ATF.
16. Perform the mechanical system test. (See MECHANICAL SYSTEM TEST [FS5A-EL].) See: Testing and Inspection/Initial Inspection and

Diagnostic Overview/Mechanical System Test

17. Perform the road test. (See ROAD TEST [FS5A-EL].) See: Testing and Inspection/Initial Inspection and Diagnostic Overview/Road Test

Shift Solenoid, A/T > < Solenoid Valve Removal/Installation (Primary Control Valve Body)