626 L4-2184cc 2.2L SOHC Turbo F2 (1988)

Canister Purge Control Valve: Testing and Inspection
No. 1 Purge Control Valve
Fig. 33 Testing No. 1 purge control valve.
1.
Blow through purge control valve from port A, Fig. 33, and ensure air does not flow in.
2.
Connect suitable vacuum pump to valve and apply vacuum of at least 4.33 inches Hg.
3.
Blow through port A and ensure air flows in.