mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Diagram Information and Instructions|Page 2476 > < Diagram Information and Instructions|Page 2474
Page 1
background image

High-Tension Lead: Testing and Inspection

INSPECTION

1. Measure resistance of the high-tension leads.
2. If not as specified, replace the high-tension lead set.

Specification: 16 k Ohms per 1m (3.28 ft)

Diagram Information and Instructions|Page 2476 > < Diagram Information and Instructions|Page 2474