CX-9 AWD V6-3.7L (2008)
14. Verify that the clearance of the A-pillar is within the range shown in the figure, and press along the perimeter of the glass.
15. Install the headliner.
16. Install the following parts:
1. Assist handle
2. A-pillar trim
3. Map light
4. Sunvisor
5. Rearview mirror
6. Rain sensor
7. Cowl grille
8. Windshield wiper arm and blade
17. Allow the sealant to harden completely.
Sealant hardening time: 24 h