Millenia S V6-2.3L DOHC (Miller cycle) (2000)
1. Connect the SST (NGS tester) to the DLC-2.
2. Verify that the throttle valve is at the CTR
3. Loosen the attaching screws.
4. Turn the ignition switch to ON.
5. Select the PID/DATA MONITOR AND RECORD" function on the NGS display.
6. Select "TP V" on the NGS display. NGS measures and shows the voltage.
Specification:
-
CTP: 0.1 - 1.1 V
-
WOT: 2.8 - 4.5 V
(Verify that the voltage increase is directly proportioned to the throttle valve opening angle.)
7. Tighten the attaching screws.
-
If not adjusted, replace the TP sensor.
Tightening torque: 1.6 - 2.3 N.m {16 - 24 kg.cm, 14 - 20 in.lb}