mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Timing Chain|Removal|Page 2202 > < Timing Chain|Removal|Page 2200
Page 5
background image

Timing Chain Cover And Oil Pan Assembly

17. Using a new gasket, install water pump and torque to 14-19 in.lbs (19-25 Nm).
18. Apply vegetable oil to the O-ring and install the coolant bypass pipe, torque mount bolt to 27-38 ft.lbs (37-52 Nm).

Apply Vegetable Oil To New O-ring Prior To Installation

19. Using SST 49 S120 710 or equivalent, install crankshaft pulley and torque to 130-145 ft.lbs (177-196 Nm).

Using SST On Crankshaft Pulley

20. Apply a continuous bead of silicone sealant to the oil pan along the inside of the bolt holes and overlap the ends.  Install oil pan and torque to 

70-95 in.lbs (8-11 Nm).

21. Apply silicone sealant to the indicated area of the cleaned cylinder head, place new cylinder head gasket in position.

Timing Chain|Removal|Page 2202 > < Timing Chain|Removal|Page 2200