MPV 4WD V6-3.0L SOHC (1990)
Ignition Switch: Testing and Inspection
Ignition switch "START" signal (M/T) can be checked at ECU terminal 3B.
While cranking, terminal 3B voltage should be 6 - 11V. With ignition "ON" terminal voltage should be below 2.5V.