MPV DX V6-2.5L DOHC (2000)
Refrigerant Pressure Sensor / Switch: Testing and Inspection
REFRIGERANT PRESSURE SWITCH INSPECTION
1. Install the manifold gauge set.
2. Disconnect the refrigerant pressure switch connector.
High And Low Pressure Switch
Middle Pressure Switch
3. Verify the high-pressure side reading of the manifold gauge and continuity between the terminals B and C, and A and D is as shown.
-
If not as specified, replace the front cooler pipe No.2.