MPV ES V6-2.5L DOHC (2001)
![background image](/mazda/mpv_es/v6-2.5l_dohc/Page-390001.png)
Ignition Cable: Testing and Inspection
HIGH-TENSION LEAD INSPECTION
1. Measure the resistance of the high-tension leads using an ohmmeter.
-
If not as specified, replace the high-tension leads.
Ignition Cable: Testing and Inspection
HIGH-TENSION LEAD INSPECTION
1. Measure the resistance of the high-tension leads using an ohmmeter.
-
If not as specified, replace the high-tension leads.