MPV LX V6-2.5L DOHC (2000)
Canister Purge Solenoid: Testing and Inspection
Simulation Test
1. Carry out the "Purge Control Inspection".See: Testing and Inspection/Purge Control Inspection
-
If not as specified, perform the following inspection of the purge solenoid valve.
Airflow Inspection
NOTE: Perform the following test only when directed.
1. Remove the purge solenoid valve.
2. Inspect airflow between the ports under the following conditions.
-
If not as specified, replace the purge solenoid valve.
-
If as specified but the "Purge Control Inspection" failed, inspect the vacuum hoses for improper routing, kinks or leakage, and inspect "Circuit
Open/Short Inspection".
Circuit Open/Short Inspection
1. Disconnect the PCM connector.
2. Connect the SST (104 Pin Breakout Box) with the PCM disconnected.
3. Tighten the connector attaching bolt.
Tightening torque
7.9 - 10.7 N.m {80 - 110 kgf.cm, 69.5 - 95.4 in.lbf}
4. Inspect the following wiring harness for open or short (Continuity check).
Open circuit
-
If there is no continuity, the circuit is open. Repair or replace the harness.
-
Purge solenoid valve terminal B (harness-side) and 104 pin breakout box terminal 18
-
Purge solenoid valve terminal A (harness-side) and main relay terminal D (harness-side)
Short circuit