MPV LX V6-2.5L DOHC (2000)
19. Verify that the selector lever range position and TR switch are aligned, then connect the selector cable.
20. Inspect for continuity at the TR switch.
21. Connect the TR switch connector.
22. Install the battery carrier, battery tray, and battery.
23. Connect the negative battery cable.
24. Inspect operation of the TR switch.