MX-6 LS V6-2.5L DOHC (1997)
Shift Interlock Solenoid: Testing and Inspection
1. Remove the front console.
2. Shift the selector lever to P position.
3. Turn the ignition switch to ON (engine off), and check terminal voltages and continuity, referring to the chart illustrated. When checking continuity
between terminal b (harness side) and ground, disconnect connector B.
4. If not as specified, repair the wire harness and/or replace the shift-lock actuator.
5. Install the front console.
6. Verify correct operation of the shift-lock system.