mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Radiator Cooling Fan > < Cooling System|Capacity Specifications|Page 1099
Page 1
background image

Coolant: Service and Repair

DRAINING 

1. Remove the radiator cap and loosen the radiator drain plug.
2. Drain the coolant into a container.
3. Flush the cooling system with water until all traces of color are gone.
4. Let the system drain completely.
5. Tighten the radiator drain plug.

Tightening torque:  

0.7 - 1.1 Nm (7 - 10 inch lbs.) 

REFILLING 

NOTE: Use the proper amount and mixture of ethylene-glycol based coolant.

1. Slowly pour the coolant into the radiator up to the coolant filler port.

Filling pace:  

1.0 L (0.88 Imp qt.) / min. max. 

2. Fill the radiator reservoir up to the FULL mark.
3. Fully install the radiator cap.
4. Start the engine and let it idle until it warms up.
5. If the temperature increases beyond normal, there is excessive air in the system. Stop the engine and allow it to cool; then repeat steps 1-3.
6. Run the engine at 2,200 - 2,800 rpm for 5 minutes; repeat several times.
7. Stop the engine and allow it to cool. 
8. Inspect for the coolant level. If the coolant level has dropped, repeat the procedure from step 1.

Radiator Cooling Fan > < Cooling System|Capacity Specifications|Page 1099