mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Lower Arm & Stabilizer Bracket - Revised|Page 4135 > < Lower Arm & Stabilizer Bracket - Revised
Page 1
background image

Ball Joint: Testing and Inspection

1.

Attach preload attachment 490180510B or equivalent onto the ball stud.

2.

Using a suitable scale, measure preload by pulling on scale handle and while ball stud is rotating. Scale reading obtained should be 1.1-2.6 lbs.
Measure preload after shaking ball joint stud 3 or 4 times.

Lower Arm & Stabilizer Bracket - Revised|Page 4135 > < Lower Arm & Stabilizer Bracket - Revised