RX8 2RTR-1.3L (2006)
21. Set the adjustable wrench as shown in the figure to hold the manual shaft lever.
22. Tighten the manual shaft nut using a torque wrench.
Tightening torque 23-33 N-m (2.3-3.4 kgf-m, 17-24 ft-lbf)
23. Shift the selector lever to the P position.
24. Turn the manual shaft lever to the P position.
25. Inspect TR switch continuity. (See Transmission Range (TR) Switch Inspection [SJ6A-EL].) See: Testing and Inspection/Component Tests and
General Diagnostics/[RC4A-El] Automatic Transmission/Transaxle/Transmission Range (TR) Switch Inspection
26. Connect the TR switch connector.
27. Align the mark of the manual shaft lever component as shown. in the figure.
28. Install the manual shaft lever component installation nut.
Tightening torque 10.8-14.7 N-m (1.1-1.4 kgf-m, 8.0-10.8 ft-lbf)
29. Install the insulator.
Tightening torque 8-11 N-m (82-112 kgf-cm, 72-97 in-lbf)
30. Install the catalytic converter.
31. Connect the negative battery cable.
32. Install the battery cover.
33. Install the engine cover.
34. Inspect TR switch operation.