mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Fuel Systems|Page 3217 > < Fuel Systems|Page 3214
Page 1
background image

Throttle Full Open Switch: Testing and Inspection
Fuel Systems

Non Turbo

1.

Connect vacuum gauge with "Y" fitting to EGR valve.  Start engine, increase engine speed to 1200 RPM and actuate microswitch.

2.

Vacuum reading on gauge should should drop to 0 in. Hg.  Vacuum control flap should move into a deactivated position.  

3.

If test results are not as outlined above, test individual components.

Turbo

1.

Connect vacuum gauge with "Y" fitting to EGR valve.  Start engine, increase engine speed to 1200 RPM and actuate microswitch.

2.

Vacuum reading on gauge should should drop to 0 in. Hg.  Vacuum control flap should move into a deactivated position.  

3.

If test results are not as outlined above, test individual components.

Fuel Systems|Page 3217 > < Fuel Systems|Page 3214