mercedesbenz Workshop Repair Guides

Mercedes Benz Workshop Service and Repair Manuals

Removal/Installation|Page 4397 > < Removal/Installation|Page 4395
Page 10
background image

Place sealing ring (3) and plastic cover (1) on ball joint.

28. On drag link 2nd version, check rubber sleeve (2) on joint. If sleeve is damaged, check joint for wear and replace drag link, if required.

29. Attach track rod and drag link to pitman arm, insert cotter pins into castle nuts. Tightening torque 35 Nm (3.5 kpm) reference value.

30. Remove blind plug. Connect high-pressure expanding hose and connecting pipe for return flow hose.

Attention!
Pay attention to perfect installation of hose. Even minor chafing marks may result in early oil losses and consequently in a loss of hydraulic support.

Removal/Installation|Page 4397 > < Removal/Installation|Page 4395